Installations · 2018 — present
Installations, 2018 to present.
A partial list of the buildings where Ballistiglass is installed and in service today. Some were donations, carried by the Ballistiglass Charitable Foundation. Some were commissioned. Each one is installed, in use, and documented.
Donations · carried by BCF
Donated installations.
The first installation we ever completed was donated. So were the next three. Each was placed in a community touched by the events of February 14, 2018.
-
Heron Heights ElementarySite photograph on file · released on request
Donation · 2018Heron Heights Elementary
The first Ballistiglass install. Donated to a Parkland elementary school in the months after February 14, 2018.
-
Marjory Stoneman Douglas HSSite photograph on file · released on request
Donation · 2019Marjory Stoneman Douglas HS
Donation to the school community. Specified and installed by our associates alongside the administration.
-
Eagles' HavenSite photograph on file · released on request
Donation · via JAFCOEagles' Haven
A wellness center serving families affected by the events of February 14, 2018. Installed in partnership with JAFCO.
Commissioned installations
Commissioned installations.
Paid installations specified and completed by our associates. Each build follows the same protocol as the donations — same materials, same testing, same installation team.
-
Commercial install
Temple Kol Tikvah
Sanctuary entry glazing, commissioned by the congregation. BallistiMAX with the BallistiSHOCK reactive layer.
-
Commercial install
Reception lobby, Tamarac
Reception build with stopped rounds documented on the glass face during field testing.
-
Commercial install
Government reception
Full reception build — BallistiMAX at the glazing line and BallistiSCAN walk-through detection at intake.
-
Commercial install
Holocaust Memorial of Miami Beach
Commissioned install protecting an institution of memory and public record.
The record
Installation documentation on request.
When an associate from our specifications team responds to a new request, the conversation starts from the same baseline: we have done this before, in buildings like yours, and the paperwork is on file. School boards, congregations, and government specifiers can request installation documentation, UL 752 certification, and third-party ballistic test reports at intake.